CMKS Consultancy Sdn Bhd
2018 PROJECTS

MRT LEMBAH KLANG LALUAN SUNGAI BULOH - SERDANG - PUTRAJAYA (SSP LINE 2) UNDERGROUND WORKS
CREC Geotechnical Engineering (M) Sdn Bhd
Guide beam design
Lifting beam design
Bearing capacity check for heavy machineries
D-wall trench stability check
GFRP Soft Eye Design
Slope stability check for temporary cut / fill slopes
Temporary sheet pile design
Silo foundation design

KVLRT3 PACKAGE FOR PIER P18-02 TO P18-06
Sunway Construction Sdn Bhd
Temporary sheet pile excavation design

KVMRT PIER FOUNDATION DUE TO EARTHWORKS FOR MIXED DEVELOPMENT AT CHERAS
Guocoland (Malaysia) Berhad
Carry out 2-D MRT Pier Impact Assessment