top of page
LOGO%20-%20Standard%20(high%20res)_edite

CMKS Consultancy Sdn Bhd

2018 PROJECTS

MRT LEMBAH KLANG LALUAN SUNGAI BULOH - SERDANG - PUTRAJAYA (SSP LINE 2) UNDERGROUND WORKS

CREC Geotechnical Engineering (M) Sdn Bhd

  • Guide beam design

  • Lifting beam design

  • Bearing capacity check for heavy machineries

  • D-wall trench stability check

  • GFRP Soft Eye Design

  • Slope stability check for temporary cut / fill slopes

  • Temporary sheet pile design

  • Silo foundation design

KVLRT3 PACKAGE FOR PIER P18-02 TO P18-06

Sunway Construction Sdn Bhd

  • Temporary sheet pile excavation design

KVMRT PIER FOUNDATION DUE TO EARTHWORKS FOR MIXED DEVELOPMENT AT CHERAS

Guocoland (Malaysia) Berhad

  • Carry out 2-D MRT Pier Impact Assessment

© 2023 by Sphere Construction. Proudly created with Wix.com

  • Facebook
  • Linkedin
bottom of page